Content
Work by others
-
(All) Canting of any ledge greater than 4 inches deep: If depth = X, canting material should be a minimum length of (hypotenuse) = X / cos(75), taking it to a height of X * tan(75). -
(1-3) Fire caulking and pan-decking sprayed. -
(All) Electricians need to verify separation of circuits, labels and ensure proper foot candles
(turn overhead lighting down firing). -
Auxiliary contact wires need to be landed. -
Control room lighting needs installed (1-3), all gfci's must share the same circuit (or be dedicated to only the control room if more than one).
-
(All) Telephone lines need to be activated with proper caller id setup. K156 Elevator # -
(All) Fire alarm system needs to be finished, vesda tubing and devices, heat detectors, shunt trip activation (with timer function). -
Fire wires and phone lines need to be pulled into our controllers -
Sump pits need to be covered