* ~~(All) Canting of any ledge greater than 4 inches deep: If depth = X, canting material should be a minimum length of (hypotenuse) = X / cos(75), taking it to a height of X \* tan(75).~~
* ~~(1-3) Fire caulking and pan-decking sprayed.~~
* (All) Electricians need to verify separation of circuits, labels and ensure proper foot candles ~~(turn overhead lighting down firing)~~.
* ~~Auxiliary contact wires need to be landed.~~
* Control room lighting needs installed (1-3), all gfci's must share the same circuit (or be dedicated to only the control room if more than one).
* ~~(All) Telephone lines need to be activated with proper caller id setup. K156 Elevator #~~
* ~~(All) Fire alarm system needs to be finished, vesda tubing and devices, heat detectors, shunt trip activation (with timer function).~~
* ~~Fire wires and phone lines need to be pulled into our controllers~~
* Sump pits need to be covered