NOCC for 1-3 has been submitted.
Awaiting GC confirmation the following have been addressed:
3rd floor lobby sill trip hazzard.
Control room sprinkler pipe needs guage removed & capped.
Control room vent needs screening (cover).
Sump pits need permanent covering.
E1 NOCC
E2 NOCC
E3 NOCC
E4 Passed
This widget is currently empty.
This widget is not available.