Content
View differences
[Wiki](https://p.elevatornode.com/projects/eli-lilly-idap-k156/wiki/wiki) [Wiki](https://elevatornode.com/projects/eli-lilly-idap-k156/wiki/wiki)
NOCC for 1-3 has been submitted.
~~Awaiting GC confirmation the following have been addressed:~~
* ~~3rd floor lobby sill trip hazzard.~~
* ~~Control room sprinkler pipe needs guage removed & capped.~~
* ~~Control room vent needs screening (cover).~~
* ~~Sump pits need permanent covering.~~
NOCC for 1-3 has been submitted.
~~Awaiting GC confirmation the following have been addressed:~~
* ~~3rd floor lobby sill trip hazzard.~~
* ~~Control room sprinkler pipe needs guage removed & capped.~~
* ~~Control room vent needs screening (cover).~~
* ~~Sump pits need permanent covering.~~