Expand project menu
[Wiki](https://elevatornode.com/projects/eli-lilly-idap-k156/wiki/wiki)
NOCC for 1-3 has been submitted. is ready on our end.
~~Awaiting Awaiting GC confirmation the following have been addressed:~~ addressed:
* ~~3rd 3rd floor lobby sill trip hazzard.~~ hazzard.
* ~~Control Control room sprinkler pipe needs guage removed & capped.~~ capped.
* ~~Control Control room vent needs screening (cover).~~ (cover).
* ~~Sump Sump pits need permanent covering.~~ covering.
Back